1. Pre-Screening Questionnaire

Please answer the following to determine if a formal risk assessment is required for your project.

2. Administrative Details

Must be a valid @ulster.ac.uk address

3. Crew List & Contact Details

List any additional crew members assisting on this shoot.

4. Locations & Environment

Add each location with its filming date and time, contact details, and any specific environmental risks present. If you are filming at the same location on more than one date, or at several different locations, add a separate location entry for each session.

5. Logistics & Storage

For each location added above, select it below and describe how equipment will be transported to it and stored/protected while on site.

6. Equipment Request

7. Risk Matrix

Understanding risk management

Risk assessment means thinking about what could go wrong, who or what could be affected, and how you can prevent or reduce the consequences. Consider everyone affected by your production, including crew, contributors and the public, during preparation, recording and publication.

Likelihood means how likely the harm or loss is to happen in the circumstances you describe.

Severity / consequence means how serious the resulting harm or loss could be. This can include physical injury, psychological harm, safeguarding concerns, or damage to equipment and other financial losses.

Choose a likelihood rating and a severity / consequence rating. The calculator multiplies these to produce the risk score and corresponding risk level.

Severity / consequence guide

1. Negligible

Minimal impact with no lasting harm. For example, brief discomfort or unease, or negligible damage with no meaningful repair cost or disruption.

2. Minor

Limited effects of brief duration that are readily resolved. For example, a small cut or bruise, distress that passes quickly, or minor equipment damage requiring a straightforward repair.

3. Moderate

Harm or loss that affects normal activities or requires meaningful recovery or remedial action. For example, an injury requiring treatment and time to recover, distress affecting sleep or study, or equipment damage requiring repair or replacement and disrupting the shoot.

4. Major

Serious harm or substantial loss with significant or lasting effects. For example, a serious fracture, significant psychological harm, disclosure of a contributor's identity exposing them to sustained harassment, or equipment loss that prevents the production from continuing as planned.

5. Severe / catastrophic

Death, an injury that threatens life or causes permanent disability, profound enduring psychological harm, or identification exposing someone to violence that threatens their life. For financial or equipment risks, consequences would be exceptional, with lasting effects extending substantially beyond the individual production.

These examples are guides. Select the level that best describes a reasonably foreseeable consequence in your situation, and explain your choice. Consider the seriousness and duration of the effects, rather than relying on the name of an injury or incident alone.

For equipment or financial risks, describe the likely loss, estimated cost where known, and effect on the production. Where a hazard could affect both people and equipment, assess each consequence and do not average serious harm down.

Before and after controls

First assess the risk before the additional controls you propose, stating any precautions already assumed to be in place. Then describe your controls and assess the remaining risk with those controls implemented.

Controls often reduce likelihood without changing how serious the consequences could be. Do not automatically lower both ratings or assume every remaining risk must be "Low".

A low score does not replace tutor approval or any required safeguarding action. If you are unsure how to assess a risk, ask your tutor rather than guessing. Review your assessment when the production plans or circumstances change.

Likelihood
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
1 2 3 4 5
Severity / consequence

Interactive Risk Calculator

Likelihood

Severity / consequence

Select Options
Hazard Activity: What could cause harm, to whom and how? Initial risk Control Measures Residual risk

8. Additional Guidelines

⚠ Lithium Ion Battery Safety: Camera, audio, and lighting batteries must be kept away from heat, water, and direct sunlight, and stored in a padded, fire resistant case when transported. Never use a battery that is swollen, punctured, or damaged, and never leave batteries charging unattended overnight. If a battery overheats, smokes, or catches fire, do not use water and do not attempt to fight the fire yourself. Evacuate the area, raise the alarm, and call the emergency services.

9. Police & Security Declarations

Does your production involve any of the following?

Depending on your filming locations, you may need to notify the PSNI and/or An Garda Síochána.

10. Terms & Student Declaration